2013 Session: 215

2013 Session: 215

  • Ultra-Rapid Underpass: TBM Excavation in Soft Ground from Surface Elevation Without Shaft or Large-Scale Open Cut Pit
    Abstract: The new tunneling technology in soft ground called URUP (Ultra Rapid Underpass) was developed in an attempt to allow construction of a roadway underpass tunnel in a busy intersection where there is limited work space available while being required to accelerate a construction schedule to minimize adverse impacts to the local environment. The URUP method enables a Tunnel Boring Machine (TBM) to launch and hole through directly from ground level safely maintaining the ground stability from zero to ultra thin ground coverage and eliminate the need for the large-scaled open cut excavation typically required for launching and receiving a TBM. This paper introduces a new shield tunneling technology named URUP and discusses the experimental construction undertaken in the development process. The paper also provides project reports on three of the public projects that applied the URUP method.
    Authors: Zick, Paul; Sugihara, Hiroaki; Takatoku, Yuhei; Sada, Soichi
    Authors: Zick, Paul; Sugihara, Hiroaki; Takatoku, Yuhei; Sada, Soichi
    Year: 2013
    Document Type: Paper
    Subject: Bridges and Other Structures; Design
    Session: 215
    Paper Number: 13-1080
  • Ultra-Rapid Underpass: TBM Excavation in Soft Ground from Surface Elevation Without Shaft or Large-Scale Open Cut Pit
    Authors: Zick, Paul
    Authors: Zick, Paul
    Year: 2013
    Document Type: Presentation
    Subject: Bridges and Other Structures; Design
    Session: 215
    Paper Number: 13-1080
  • Ultra-Rapid Underpass: TBM Excavation in Soft Ground from Surface Elevation Without Shaft or Large-Scale Open Cut Pit
    Authors: Takatoku, Yuhei
    Authors: Takatoku, Yuhei
    Year: 2013
    Document Type: Presentation
    Subject: Bridges and Other Structures; Design
    Session: 215
    Paper Number: 13-1080
  • Port of Miami Tunnel
    Authors: Dusseault, Steven
    Authors: Dusseault, Steven
    Year: 2013
    Document Type: Presentation
    Subject: Bridges and Other Structures; Design
    Session: 215
    Paper Number: P13-5588
  • Use of 12+ m TBM for Subway Development and Concept of Stacked Platforms
    Authors: Nasri, Verya
    Authors: Nasri, Verya
    Year: 2013
    Document Type: Presentation
    Subject: Bridges and Other Structures; Design
    Session: 215
    Paper Number: P13-5589
  • SR-99 Alaskan Way in Seattle, Washington
    Authors: Munfah, Nasri
    Authors: Munfah, Nasri
    Year: 2013
    Document Type: Presentation
    Subject: Bridges and Other Structures; Design
    Session: 215
    Paper Number: P13-5587